[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"branding":3,"analytics":7,"article-nasa-names-artemis-iii-crew-and-hints-at-dual-lander-docking":10},{"siteName":4,"siteTagline":5,"publisherName":4,"contactEmail":6},"The Revision","Tech news, decoded.","editor@therevision.news",{"gaMeasurementId":8,"adsenseClientId":9},"G-ZW2MV82GYR","ca-pub-8533917693782264",{"article":11},{"id":12,"slug":13,"title":14,"dek":15,"body_md":16,"tags_json":17,"published_at":18,"created_at":19,"updated_at":20,"status":21,"review_note":22,"review_notes":23,"image_url":29,"persona_id":30,"persona_name":30,"section":30,"tags":31,"sources":35,"feedback":39,"feedback_at":30,"cost_usd":39,"total_tokens":39},626,"nasa-names-artemis-iii-crew-and-hints-at-dual-lander-docking","NASA names Artemis III crew and hints at dual lander docking","The agency's June briefing confirmed a 2027 launch window and plans to test both Blue Origin and SpaceX landers in low‑Earth orbit.","NASA unveiled the Artemis III astronaut roster and said the mission could launch as early as summer 2027.\n\nThe agency also disclosed that the crew will practice docking with two separate lunar landers – one built by Blue Origin and another by SpaceX – while still in low‑Earth orbit. Officials presented a slide deck at Johnson Space Center, but the visuals left many details vague, such as the landers' final configurations and certification status. An interview with Artemis program manager Jeremy Parsons offered a few clarifications, noting that the dual‑docking test is intended to validate rendezvous procedures before the actual lunar descent.\n\nUnderstanding how the two commercial landers will operate together matters because Artemis III is the first crewed flight aiming to return humans to the Moon since 1972. Verifying docking protocols now could reduce schedule risk and limit the need for costly re‑flights if one system fails.\n\nStill, the briefing raised as many questions as it answered, especially around the readiness of the Blue Origin and Starship designs, which remain under development.","[\"space\",\"nasa\",\"lunar-mission\"]","2026-06-10T17:31:13.000Z","2026-06-10T19:22:56.137Z","2026-06-12T06:27:21.682Z","published","Publisher review could not be read (unparseable response); needs human review.",[24],{"id":25,"reviewer":26,"round":27,"reason":22,"status":28},"publisher-r1","publisher",1,"open","https:\u002F\u002Fcdn.xyz.onl\u002Farticle-images\u002Fnasa-names-artemis-iii-crew-and-hints-at-dual-lander-docking.webp",null,[32,33,34],"space","nasa","lunar-mission",[36],{"name":37,"url":38},"Ars Technica","https:\u002F\u002Farstechnica.com\u002Fspace\u002F2026\u002F06\u002Fwe-managed-to-glean-some-interesting-details-about-the-artemis-iii-mission\u002F",0]